Coupling, bolts, shafts, spacers CNC parts

Overview Quick Details

Place of Origin:
Fujian, China
Brand Name:
Xiufeng
Model Number:
201405231331
Type:
Drilling, Etching / Chemical Machining, Laser Machining, Milling, Turning, Wire EDM
CNC Machining or Not:
CNC Machining
Micro Machining or Not:
Micro Machining
Material Capabilities:
Aluminum, Brass, Bronze, Copper, Stainless Steel, Steel Alloys

Supply Ability

Supply Ability:
1000000 Piece/Pieces per Month

Packaging & Delivery

Packaging Details
Packed by poly bags at first, then in master carton; or according to your request.
Port
Xiamen, China
Lead Time :
10-20 days after order confirmation normally

A.Brief introduction of our company:

1.Foundation:

Founded in 1995, having 18 years history with good reputation

2.Our machines include:

210 CNC lathe200 auto lathe10 CNC Tapping Center2 MAZAK five axis CNCEach month, we increase about 10 lathes.3.Certificate: ISO9001:20084.Scale: 280 workers, 14,000 square metersfactory(We will move to 80,000 square meters workshop next year).5.Annual revenue: 1.3 billion RMB(equal to 22 million US Dollars)6.Location: in coastal city Xiamen and Zhangzhou, with convenient international air fly and sea transportation services.7.Supply capacity: 3 billion lead-free units. And our capacity is still increasing each month.

B.Some of our customers:

Apple Inc(70-80% of iPhone’s lens gasket are made by us)

Samsung

Toyota

Honda

Benz

ABB Group

TDK

C.Promises for cooperation

1.100% quality guarantee

2.100% genuine material3.Large scale production, shorter lead time

4.Tolerance:+/-0.005mm

5.Customer First, QualityFirst

D.Brief introduction of our EPT/ODM CNC services

1.Material:

Stainless steel, mild steel, aluminum alloy, brass, copper, bronze, etc..2.Processing:

CNC turning, milling, drilling, threading, stamping, punching, screw machining, etc..3.Surface finish:

Chrome plating, zinc plating, blackening, Nickel plating, Electrophoresis, Anodization4.FOB Port:

Xiamen, China5.Payment terms:

T/T,Western Union,L/C6.Normal Delivery time:

10-20 days after order confirmation.

E.Factory overview:

F.Workshop:

G.Machines:

H.Test instruments:

I.Xiamen office:

J.Zhangzhou office:

Welcome you to visit our factory and start our partnership!